Projects completed in Oil & Gas Sector & Petrochemical Industries during last 10 years (2000-2010)


 
  Clients Name Platform / Location Description of Job Year Remark
ONGC Ltd., Mumbai Heera Process Complex
Revamping of paging system at Heera Process Complex on turnkey basis
2010 Completed
ONGC Ltd., Mumbai Mumbai High South and Heera Process complex etc.
Operation & maintenance control HVAC and other Refrigeration system installed in offshore facilitate of ONGC Western Offshore Mumbai Region
2005-2009 (with extn.of 1 yr. for 2008-09) Completed
ONGC Ltd., Mumbai BHF
Installation of 2 Nos. I/u Compressor units at BCPA
2009 Completed
ONGC Ltd., Mumbai NQO
Turnkey project for Repair and Replacement of the existing Terra Fire Make F&G Gas Panels of the Process Gas Compressors NQO Offshore platform complex
2008 Completed
Cochin Shipyard / ONGC Sagar Kiran
Replacement of existing two cranes with sea trax crane each 40T on rig Sagar-Kiran
   
Cochin Shipyard Ltd. Sagar Kiran
Commissioning of Dock Announcing System at Sagar Kiran
2008 Completed
Cochin Shipyard Ltd. Sagar Bhushan
Commissiong of Paging System at Sagar Bhushan
2008 Completed
Cochin Shipyard Ltd. Sagar Kiran
Dismantling Of Existing Unit, Installation, Testing and Commissioning of Accommodation AC Plant
2007 Completed
ONGC Ltd., Mumbai NQ, INFILL, SCA
Revamping-Paging System
2007 Completed
Hindustan Shipyard Ltd. NQO
Fabrication and Installation of GRE Piping on NQO Platform
2007 Completed
Larsen & Toubro SQ, SHW, SHG, SHD
Fabrication, Erection, testing Pre-commissioning, & commissioning for complete Architectural, electrical & instrumentation system
2006 Completed
Larsen & Toubro 9 WELL MFY Hazira
Fabrication, Erection, Testing, pre-commissioning, & commissioning for complete Architectural & Electrical system (ZB,RS-11,RS-1,RS-2,RS-3)
2005 Completed
Larsen & Toubro PS2 & PS3 MFY Hazira
Fabrication, Erection Testing, pre-commissioning, & commissioning for complete Architectural & Piping system for PS2 & PS3 LQ Modules
2005 Completed
Larsen & Toubro MNW MFY Hazira
Fabrication, Erection Testing, pre-commissioning, & commissioning for complete Architectural & Piping system for PS2 & PS3 LQ Modules
2004 Completed
Larsen & Toubro MNW MFY Hazira
Fabrication, Erection Testing, pre-commissioning, & commissioning for complete E&I works of PS2 & PS3 LQ Modules
2004 Completed
Nicco Corporation Limited ONGC Offshore Project
Supply, Dismantling, Erection, Testing & Commissioning work for ONGC Offshore Project
2004 Completed
BSES Ltd. WIN , BHS and NQ Platforms
Supply, Installation & Commissioning related to E & I job
2004 Completed
Asea Brown Boveri Ltd., Kolkata SHQ, SHD, ICP & ICW Platforms Bombay High
Servicing / Overhauling of old, 03 Installation & Commissioning of HVAC System at SH & IC Complexes
2002-2003 Completed
Nitin Fire Protection Industries Ltd., Mumbai IC Complex Platforms Bombay High
Removal of old Halon System, Fabrication and Installation of Piping, Cabinets for FM 200
2002-2003 Completed
BHEL, Mumbai ICW & WIN Platforms Bombay High
Electrical & Instrumentation works Connected to Chemical Injection skid at ICW & WIN Platforms
2002-2003 Completed
HI-POINT Services (I) Pvt. Ltd., Mumbai North, South & Heera fields at ONGC Bombay High
Mechanical, Piping, Electrical & Instrumentation works for Sewage Treatment Plant Replacement
2001-2002 Completed
ONGC Ltd., Mumbai SHP Bombay High
Servicing Overhauling refurbishment & re-commissioning of GDU at SHP Platform
2001 Completed
Bharat Heavy Electricals Ltd., Mumbai NQG Bombay High
Installation & commissioning of PGC Coolers
2001 Completed
Hindustan Shipyard Ltd., Visakhapatnam NLW Platform
Shifting of Life Boats at NLW Platform
2001 Completed
Pimac Engineering & Services Pvt. Ltd. SHQ Bombay High
Control Retrofit TG at SHQ Platform
2001 Completed
Hindustan Shipyard Ltd., Vaizag Neelam Complex ONGC
Augmentation of Living Qtr. At Neelam Platform
2001 Completed
Mazagon Dock Limited, India WIS ONGC
Repair, Installation of HVAC System
2000 Completed
BSES Ltd., Mumbai BHN ONGC Bombay High
Revamping of Electrical works at BHN Platforms
2000 Completed
Himachal Alkalies, Mumbai BHS / SLQ ONGC Bombay High
Replacement of Cables, Trays, tray supports, Wiring works at BHS/SLQ Phase-II
2000 Completed
Mazagon Dock Limited, Mumbai Bombay High North & South Fields
Liquidation of punch points killing of CRMP at ONGC's 17 unmanned platforms
2000 Completed
Cochin Shipyard Limited, Cochin INS Viraat
Electrical Works on Deck Edge Lift in INS Viraat
2000 Completed
Mazagon Dock Limited, Mumbai Bombay High North & South Fields
Liquidation of Punch Points for 14 OCI Vessel Project
2000 Completed
Oil & Natural Gas Corporation Ltd., Mumbai BHN / NQO Bombay High
Fabrication, Supply & Installation of Gas Measuring Orifice Flanges
2000 Completed
Mazagon Dock Limited Himachal Alkalies, Mumbai BHS / SLQ ONGC Bombay High
Replacement of Cables, Trays, tray supports, Wiring works at BHS/SLQ Phase-I
2000 Completed
             

Projects undertaken during the years prior to 2000


  Clients Name Platform / Location Description of Job Year Remark
Solar Turbines Ltd., Singapore BHN / BHF ONGC Bombay High
Installation and Commissioning assistance for Retrofitting of Control system of Solar Turbines on BHN/BHF offshore platforms
1999 Completed
Asea Brown Boveri, Calcutta WIN ONGC Bombay High
Revamping of HVAC system and Living Quarters at WIN Offshore Platform
1999 Completed
Pantex Geebee Fluid Power Ltd., Hyderabad SHP ONGC Bombay High
Revamping of shutdown panels at SHP offshore complex, Bombay High Field
1999 Completed
Tata Liebert Limited, Mumbai BHS ONGC Bombay High
Installation and Erection of UPS System at BHS Platform
1999 Completed
Woodlands Instruments Pvt. Ltd., New Delhi BHN ONGC Bombay High
Instrumentation work for Erection Calibration of BHN Fuel gas Conditioning skid
1999 Completed
Mazagon Dock Limited, Mumbai HX-HY & HRG ONGC Heera Field
Liquidation of punch points killing at HX-HY & HRG Platforms at Heera field
1999 Completed
Hemis Scan Systems A.S, Norway Numaligarh Refinery, Assam
Installation and commissioning of CCTV system at Numaligarh Refinery, Assam
1999 Completed
Mazagon Dock Ltd., Mumbai SHG/B-55 Bombay High
Punch List Killing on B-55 platform & SHG Modification
1999 Completed
Hemis Scan Systems A.S, Norway IOCL, Baroda
Installation and commissioning of CCTV system at Gujarat Refinery, IOCL, Baroda
1999 Completed
Supreme Offshore Constructions & Technical Services India / MDL Bombay High
Offshore hook-up & modification works for BCP-A & BPA platform related to Electrical & Instrumentation fields
1998 Completed
Reunion Engineering Co. Ltd., Cochin Rig Sagar Gaurav at CSL
Removal & Installation of 5 nos. of 1325 KVA Altemators on Board of Rig Sagar Gaurav
1998 Completed
Belts Controls, Mumbai BHN, ONGC, Bombay High
Electrical & Instrumentation job for the Installation of FM-200 system at BHF Platform
1998 Completed
Amar Raja Power System Ltd., India ONGC / Bombay High
Fabrication, installation and Commissioning of Solar Power System on 35 unmanned Platforms
1997-98 Completed
Duke Offshore Ltd., India ONGC / NHAVA
Electrical & Instrumentation work including Hookup and Commissioning for EE platform
1997-98 Completed
Larsen & Toubro Ltd., India ONGC / HRC / HAZIRA
Supply of manpower & equipments for erection & pre-commissioning of HVAC Electrical work for HRC building module project
1996-97 Completed
Camcon Engg. Pvt. Ltd., India ONGC / MDL / NHAVA
Electrical, instrumentation Architectural work for complete HX-HY Project
1996-97 Completed
Camcon Engg. Pvt. Ltd., India ONGC / MDL / NHAVA
Piping & Equipment erection work for HY Helideck at NHAVA yard
1996-97 Completed
Camcon Engg. Pvt. Ltd., India MDL / NHAVA
Completed structural fabrication and erection for HY Helideck at NHAVA
1996-97 Completed
Duke Offshore Ltd., India ONGC / WIN
Installation & Commissioning of New Water Maker and Resisting of existing Water Maker (2 nos.)
1995-96 Completed
Duke Offshore Ltd., India ONGC / WIN
Replacement of Rusted & Corroded Pipelines (AIR Header)
1995-96 Completed
Supreme Offshore Constructions & Technical Services, India ONGC / HRG / SHG
Offshore Hook-up / Modification of electrical & instrumentation work on B-121SHG, HRG, WIN HF & HR Platforms
1995-96 Completed
Supreme Offshore Constructions & Technical Services, India ONGC Bombay High
Electrical / Instrumentation Job pertaining to OCI injunction system on 14 Platforms
1995-96 Completed
Das Offshore Engg. India ONGC / NEELAM
Instrumentation work on HAS, HSB, NLM-2, NLM-3, & HRG Platforms
1995-96 Completed
Mazagon Dock Ltd., India ONGC BombayHigh
Architectural, Electrical, instrumentation jobs
1995-96 Completed
Mazagon Dock Ltd., India HAS-HSB Platforms
Punch Killing Jobs for Offshore platforms
1995-96 Completed
Essar Oil Ltd. (MDL) WIN-1, WIN-2, N-8
Punch Killing Jobs for Offshore Platforms
1995-96 Completed
Mazagon Dock Ltd., India ONGC Bombay High
I.C.P. HEERA Modification Project (E&I Jobs)
1995-96 Completed
Kinetic Technology India Ltd. For their Client HPCL, India HPCL / Bombay
Electrical & Instrumentation jobs
1995-96 Completed
Supreme Offshore Constructions & Technical Services, India HRG / LAT / ONGC
Revamping and Modification at HEERA Complex and Pre-Commissioning on HSB platform
1994-95 Completed
Duke Offshore Ltd., India. For their Client MDL, India NLM / ONGC
Electrical & Instrumentation Hook-up on NLM-7, NLM-8, NLM-10 & NLM-11 including Commission of Test Separator
1993-94 Completed
             
 