Description of Job |
Clients Name |
Platform /Location |
 |
installation of 2 Nos. I/u Compressor units at BCPA. |
ONGC Ltd. Mumbai |
BHF
(Completed)
|
 |
Dismantling Of Existing Unit, installation, Testing and Commissioning of Accommodation AC Plant. |
Cochin Shipyard Ltd. |
Sagar Kiran
(Completed)
|
 |
installation and installation of GRE Piping on NQO Platform. |
Hindustan Shipyard Ltd. |
NQO (Completed)
|
 |
Electrical & Instrumentation works Connected to Chemical Injection skid. |
BHEL, Mumbai |
ICW & WIN Platforms Bombay High
(Completed)
|
 |
installation and Erection of UPS System at BHS Platform. |
Tata Liebert Limited Mumbai |
BHS ONGC Bombay High
(Completed)
|
 |
Electrical & Instrumentation Hook-up on NLM-7, NLM-8, NLM-10 & NLM-11 including Commission of Test Separator. |
Duke Offshore Ltd. India, for their Client MDL, India |
NLM/ONGC. (Completed) |
 |
Shifting of Life Boats at NLW Platform. |
Hindustan Shipyard Ltd. Visakhapatnam |
NLW Platform(Completed)
|
 |
Repair, installation of HVAC System. |
Heinen & Hopman Engg. Pvt. Ltd. |
WIS ONGC
(Completed)
|
 |
Replacement of Cables, Trays, tray supports, Wiring works at BHS/SLQ Phase-II |
Himachal Alkalies, Mumbai |
BHS / SLQ ONGC Bombay High
(Completed)
|
 |
Electrical Works on Deck Edge Lift in INS Viraat. |
Cochin Shipyard Limited, Cochin |
INS Viraat
(Completed)
|
 |
Replacement of Cables, Trays, tray supports, Wiring works at BHS/SLQ Phase-I |
Mazagon Dock Limited Himachal Alkalies, Mumbai |
BHS / SLQ ONGC Bombay High
(Completed)
|
 |
installation and Commissioning assistance for Retrofitting of Control system of Solar Turbines on BHN/BHF offshore platforms. |
Solar Turbines Ltd. Singapore |
BHN /BHF ONGC Bombay High
(Completed) |
 |
installation and Erection of UPS System at BHS Platform. |
Tata Liebert Limited Mumbai |
BHS ONGC Bombay High
(Completed)
|
 |
Instrumentation work for Erection Calibration of BHN Fuel gas Conditioning skid. |
Woodlands Instruments Pvt. Ltd. New Delhi |
BHN ONGC Bombay High
(Completed)
|
 |
installation and commissioning of CCTV system at Numaligarh Refinery, Assam. |
Hemis Scan Systems A.S, Norway |
Numaligarh Refinery, Assam
(Completed)
|
 |
Removal & installation of 5 nos. of 1325 KVA Altemators on Board of Rig Sagar Gaurav. |
Reunion Engineering Co. Ltd. Cochin |
Rig Sagar Gaurav at CSL,
(Completed)
|
 |
Electrical & Instrumentation job for the installation of FM-200 system at BHF Platform. |
Belts Controls, Mumbai |
BHN, ONGC, Bombay High
(Completed)
|
 |
Supply of manpower & equipments for erection & pre-commissioning of HVAC Electrical work for HRC building module project. |
Duke Offshore Ltd. India |
ONGC/ WIN
(Completed)
|
 |
installation & Commissioning of New Water Maker and Resisting of existing Water Maker (2 nos.) |
Supreme Offshore Constructions & Technical Services, India |
ONGC/HRG/SHG |
 |
Replacement of Rusted & Corroded Pipelines (AIR Header). |
Duke Offshore Ltd. India |
ONGC/ WIN
(Completed)
|
 |
Electrical/ Instrumentation Job pertaining to OCI injunction system on 14 Platforms. |
Supreme Offshore Constructions & Technical Services, India |
ONGC Bombay High (Completed)
|
 |
Electrical & Instrumentation jobs. |
Kinetic Technology India Ltd. For their Client HPCL, India |
HPCL / Bombay
(Completed)
|
| |
|
 |